Santos announces Caley reservoir flow test results
The initial clean-up flow test of the Caley reservoir, in the Dorado field located in the Bedout Basin, offshore Western Australia, was conducted over a 12-hour period and achieved a maximum measured rate of approximately 11 100 bpd and 21 million ft3 of associated gas per day through a 68/64 in. choke.