Seatrium secures FPSO topsides integration contract with MODEC
Published by Jack Roscoe,
Editorial Assistant
Oilfield Technology,
Seatrium has announced that it has secured a floating production storage and offloading (FPSO) topsides integration contract from longstanding customer, Offshore Frontier Solutions Pte. Ltd.
The contract scope of work covers the installation and integration of topside modules onboard the FPSO Errea Wittu, and includes completion and commissioning support for MODEC.
Mr Marlin Khiew, Executive Vice President, Oil & Gas (Americas) of Seatrium, said, "We are pleased to be working with our longstanding customer, MODEC, on yet another FPSO topsides integration project, solidifying our position as the industry leader in FPSO conversions. Through our strong partnership and unwavering dedication, including decades of collaboration with MODEC, we continue to deliver cutting-edge offshore solutions that redefine excellence. Leveraging our deep engineering expertise, international yard footprint, and strong track record, Seatrium provides innovative, reliable, quality, and value-added offshore and marine solutions for our esteemed customers."
The FPSO Errea Wittu will be deployed in the Uaru Field, Stabroek Block, approximately 200 km offshore Guyana. The FPSO Errea Wittu is expected to have a production capacity of 250 000 bpd of oil, water injection capacity of 350 000 barrels of water per day (bwpd), 540 million ft3/d of gas production and a storage capacity of two million barrels of oil.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/07052024/seatrium-secures-fpso-topsides-integration-contract-with-modec/
You might also like
BOEM analyses proposed offshore well stimulation work at platform Gilda offshore California
The Bureau of Ocean Energy Management has issued a Notice of Intent to prepare an Environmental Impact Statement for a proposed update to the Santa Clara Unit Development and Production Plan, which includes the use of hydraulic fracturing on 16 existing wells at Platform Gilda, located 8.8 miles offshore Ventura County, California.