Skip to main content

Technip awarded contract for Jubilee project

Oilfield Technology,


Technip was awarded two contracts, worth approximately € 100 million by Tullow Ghana Limited, for the Phase 1A of the Jubilee project. The Jubilee field is located offshore Ghana at a water depth of 1300 m.

These contracts cover full project management, engineering, fabrication and installation of a new flexible riser, two rigid flowlines and 11 spools/jumpers, as well as the installation of two manifolds and 5 km of umbilicals.

Offshore installation is scheduled to be completed with the Global 1200 and the Deep Pioneer, two vessels from Technip’s fleet, in the second half of 2012.

Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/07022012/technip-awarded-contract-for-jubilee-project/

You might also like

Curbing GHG emissions and costs

Michael Weidenfeller, Product Strategy Manager for Drilling and Mobile Power Applications, Caterpillar Oil & Gas, highlights how fuel-flexible dual-fuel engine technology is an important and reliable solution to reduce diesel consumption on oil and gas rigs.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Oil & gas news