Audit of Lundin Norway AS – Edvard Grieg
Published by Joseph Green,
Editor
Oilfield Technology,
The Edvard Grieg field is being developed using a manned fixed facility comprising a processing facility, living quarters and drilling by means of an external jack-up drilling rig. The field is situated approximately 180 km west of Stavanger.
The objective of the audit was to assess how Lundin is ensuring compliance with regulatory requirements for barrier management in the Edvard Grieg development project.
Result
Non-conformities were identified in connection with:
- The emergency shutdown system
- Evacuation routes
An improvement point was identified in connection with deluge system automation.
Non-conformity:
Entails that a condition is assessed as not complying with a regulatory requirement.
Improvement point:
Entails that we have identified a deficiency, without there being sufficient grounds for determining a breach of regulatory requirements.
Adapted from press release by Joe Green
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/06022015/audit-lundin-norway-edvard-grieg-373/
You might also like
Nigeria’s oil and gas industry expands as crude and condensate production reaches 554.4 million bbls and gas output grows by 7.5 billion ft3/d in 2025
Sarens and its subsidiary in Nigeria, Sarens Buildwell, has positioned itself as the optimal strategic partner for the oil and gas sector due to its strong commitment to the highest international standards of safety and operational excellence.