ABB wins massive contract for offshore wind farm
ABB has won an order worth around US$ 1 billion from the Dutch-German transmission grid operator TenneT to supply a power link connecting offshore North Sea wind farms to the German mainland grid.
This is the largest power transmission order in ABB's history. It will deploy the world’s largest offshore HVDC (high-voltage direct current) system with a rating of over 900 MW, keeping electrical losses to less than 1% per converter station. The completed link will be capable of supplying more than 1.5 million households with clean wind-generated electricity.
ABB will design, engineer, supply and install the offshore platform, the offshore and onshore converter stations and the land and sea cable systems. ABB's HVDC Light transmission technology will transport power from the 400 MW Gode Wind II and other wind farms to an offshore HVDC converter station, which will transmit the electricity to the onshore HVDC station at Dörpen on the German coast via 135 km of underwater and underground cables. A converter station here will feed electricity into the mainland grid.
“Offshore wind power is emerging as a major source of large-scale renewable energy in Europe to help meet emission targets and lower environmental impact,” said Peter Leupp, head of ABB’s Power Systems division.
Scheduled to be operational in 2015, this offshore network will help to avoid more than 3 million tons of carbon dioxide emissions per year by replacing fossil-fuel based generation.
Germany's installed wind power capacity of over 27 gigawatts presently meets about 8% of its electricity requirements. Plans are to double that by 2020. This is the third offshore wind connection order for ABB in Germany, following the 800 MW Dolwin1 link awarded last year and previously the BorWin1 project.
Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/03082011/abb_wins_massive_contract_for_offshore_wind_farm/
You might also like
Nigeria’s oil and gas industry expands as crude and condensate production reaches 554.4 million bbls and gas output grows by 7.5 billion ft3/d in 2025
Sarens and its subsidiary in Nigeria, Sarens Buildwell, has positioned itself as the optimal strategic partner for the oil and gas sector due to its strong commitment to the highest international standards of safety and operational excellence.