Skip to main content

Hyundai Heavy Industries wins Bergading Complex order

Published by , Senior Editor
Oilfield Technology,


Hyundai Heavy Industries Co., Ltd. has announced that it has received a Letter of Award from Hess Exploration and Production Malaysia B.V. for the provision of engineering, procurement, construction, transportation, installation, hook-up and commissioning (EPCIC) contract for the Bergading Complex which comprises a central processing platform (CPP), a bridge and a wellhead platform. The Bergading Complex is part of the full field development project in North Malay Basin, which Hess operates under a production sharing contract with PETRONAS.

The complex will be located offshore Malaysia, in approximately 60 m water depth.

The CPP will be constructed at HHI’s offshore yard in Ulsan, South Korea, while the other facilities will be constructed by its appointed fabrication sub-contractor in Malaysia. The offshore installation of the Bergading facilities is scheduled to take place by the end of 2016.


Adapted from a press release by David Bizley

Read the article online at: https://www.oilfieldtechnology.com/drilling-and-production/01072014/hyundai_heavy_industries_wins_bergading_complex_order/

You might also like

Global gas demand 2025

If current trends persist, future energy demand will outpace demand expectations in many scenarios, positioning natural gas as the most scalable and responsive solution to meet growing power needs and stabilise grids.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Oil & gas news