BP chooses Kongsberg to build dynamic simulator for Mad Dog Phase 2
The digital twin models will be connected to the Mad Dog 2 facility-integrated control and safety systems to create a realistic simulation environment.
The digital twin models will be connected to the Mad Dog 2 facility-integrated control and safety systems to create a realistic simulation environment.