Skip to main content

Launch of second stage of Urengoyskoe field

 

Published by
Oilfield Technology,

SeverEnergia (a joint venture between Novatek and Gazprom Neft) has launched the second stage of the Urengoyskoye field (within the Samburgskiy license area) including the second train of the gas condensate de-ethanisation unit.

Overall capacity of the two stages of field development is approximately 13 billion m3 of natural gas and more than 4.7 million t of de-ethanised gas condensate per annum.

The wells drilled at the Urengoyskoye field target the Achimov deposits, which are characterised by relatively high depth (approximately 3700m) and high share of gas condensate in the hydrocarbon flow.


Adapted from press release by Joe Green

 

Gazprom Neft Orenburg acquires new acreage

Gazprom Neft Orenburg has bought the rights for geological prospecting and E&P rights to the Yagodny licence area in the Orenburg Oblast.


 

This article has been tagged under the following:

Oil & gas news