A gross gas column of 44.5 m, with an estimated net pay thickness of 25 m, has been identified with an interpreted gas-water contact in the reservoir. Gas sample analysis indicates a low inert content.
Dombey-1DW1 has been drilled to 3384 m MDRT1 and formation evaluation is ongoing. Further testing and analysis are required to establish commerciality however this initial data is encouraging.
Dombey-1 is being drilled with the assistance of a AUS$6.9 million PACE grant from the South Australian government.