Skip to main content

Energean announces positive results from Karish gas well

 

Published by
Oilfield Technology,

Energean Oil and Gas plc has announced successful results from production measurement performed during clean-up of the Karish Main-02 development well, which is located on the crest of the Karish Main structure, offshore Israel.
KM-02 produced from a 35 m interval of the C sand reservoir. The well flowed at a maximum rate of 120 million ft3/d of natural gas, limited only by the capacity of the surface equipment. Performance modelling confirms that the well is capable of delivering at the 300 million ft3/d design capacity when connected to the FPSO.
 

This article has been tagged under the following:

Upstream news Offshore news Upstream project news Oil & gas news