Skip to main content

MAN Energy Solutions secures subsea compression FEED order for Jansz-Io field

 

Published by
Oilfield Technology,

MAN Energy Solutions has been awarded a contract to support the FEED study of a subsea compression solution for the Chevron-operated Jansz-Io field in Western Australia.

“We are very proud to work with our alliance partner Aker Solutions on the Jansz-Io field development project for Chevron Australia,” says Uwe Lauber, CEO of MAN Energy Solutions. “Thanks to this project, we will be able to prove once again the unrivalled value and reliability of our groundbreaking subsea compression solution.”

Jansz-Io will be the first gas field outside Norway where the subsea compression technology comes to use. It is located approximately 200 km off the Australian north-west coast at a water depth of approximately 1350 m. Jansz-Io is part of the Gorgon project – one of the world’s largest natural gas developments.

MAN Energy Solutions’ scope of work within the FEED covers the technology of the subsea compressors, which will be used to maintain output as reservoir pressure drops over time. Subsea compression solutions boost the recovery of the gas more cost-effectively and with a smaller environmental footprint than conventional compressor systems that are typically installed on platforms above sea level.

“We are very excited that Chevron Australia has chosen our subsea compression solution for this technologically highly demanding project,” states Alexandre de Rougemont, Head of Sales Turbo Solutions at MAN Energy Solutions. “This is the direct result of the close collaboration between the Subsea Compression Alliance partners Aker Solutions and MAN Energy Solutions and our extensive expertise gathered together.”

MAN’s subsea compression solution has already proven its reliability and benefits for Equinor’s Åsgard gas field in Norway, where the subsea compressors reached 50 000 hours of operation with practically no stops or interruptions in December 2018.

“The great effort behind our subsea technology paid off. Today, it represents the core solution for offshore gas recovery applications to become more sustainable and efficient,” so Basil Zweifel, Vice President Head of Sales Oil & Gas at MAN Energy Solutions.

Based on Barrow Island (Western Australia), the Gorgon project includes an LNG facility designed to produce 15.6 million tpy of LNG. The subsea infrastructure will also be used to transport the gas from the Jansz-Io offshore field to Gorgon’s onshore facilities with its three LNG processing units. The project also comprises a domestic natural gas plant.

Image courtesy of Chevron.
 

This article has been tagged under the following:

Upstream news Offshore news Subsea news Upstream project news Oil & gas news