The oilfield is located in central Liaodong Bay in Bohai with an average water depth of 22.5 m. In addition to fully utilising the existing facilities of the Jinzhou 25-1 oilfield and the Jinzhou 25-1S oilfield, the project has built one eight-legged wellhead platform. A total of 19 production wells and 10 water injection wells are planned. It is expected to reach the peak production of approximately 16 500 bpd in 2023.
CNOOC holds a 100% interest in the oilfield.