Skip to main content

Shelf Drilling receives extension on jack-up rig for Egypt operations

 

Published by
Oilfield Technology,

Shelf Drilling, Ltd. has secured a one-year contract extension for the Trident 16 jack-up rig in direct continuation of its current term with Belayim Petroleum Co. for operations in the Gulf of Suez offshore Egypt.
The Trident 16 has been working with Petrobel in Belayim fields since 2015, and following this extension, the expected availability of the rig is February 2021.
 

This article has been tagged under the following:

Upstream news Offshore news Oil rig news Upstream drilling news Upstream project news Oil & gas news