Technip was awarded two contracts, worth approximately € 100 million by Tullow Ghana Limited, for the Phase 1A of the Jubilee project. The Jubilee field is located offshore Ghana at a water depth of 1300 m.
These contracts cover full project management, engineering, fabrication and installation of a new flexible riser, two rigid flowlines and 11 spools/jumpers, as well as the installation of two manifolds and 5 km of umbilicals.
Offshore installation is scheduled to be completed with the Global 1200 and the Deep Pioneer, two vessels from Technip’s fleet, in the second half of 2012.