Carnarvon Petroleum Limited has provided the following update on its near-term drilling programme as advised by the operator, Quadrant Energy.
The GSF Development Driller-1 semi-submersible drilling rig has arrived at the proposed Phoenix South-3 drilling location.
Over the next few days the rig will be anchored in place and ballasted in order to be ready to commence drilling.